3 years ago, we were in the R&D center, during that summer we worked really hard for mobile sludge separation project, we had not left the site for two months, one saying summarized by Manager Sun was still fresh to me:" The darkest never exists but the darker".
3 years later, we faced the same scorching summer, and the same sludge processing site from environmental pollution, and again worked with the colleagues from environmental protection department on the front line. Qingyang mobile sludge processing project was required by the owner to be complete within 147 days after the award of contract which will process 8000 m3 sludge, the deadline was tight and the mission is heavy. With full support from President Huang and Guo from the top and down to the staff in environmental protection department, the project started water-carrying combined commissioning. The equipment started sludge feeding commissioning which was the first and key step that relates to the success of the project. There were 6 people at site, to guarantee continuous operation of equipment and strive for instant success, for days everybody had been working continuously for 12 years, the day shift arrived at around 5 AM and left at 10 PM around, and the night shift also had been working nonstop, not to mention they had to reach to the site in case of need. The efforts won't disappoint the tenacious man, with concerted efforts, the trial run was a success, after 24 hours of continuous running, whether the equipment running or treatment effect has reached the intended effect, and won high praise of the owner.
A clip of field personnel | owner's satisfactory smile |
Copyright©2014-2023 All Rights Reserved HBP 湘ICP备2023031736号-1 Website construction: Beijing Fractal Technology Co. Ltd.